[1] time limit

 

[06] months counted from the earliest priority date is limited to claim the priority on the basis of the conventional design application under Paris Convention.

 

[2] requirements

 

In order to file an application for a design in Laos, it is required the following documents:

 

Direct National Application

 

documents

remarks

time of filing

Power of Attorney

- notarized

on filing date

Inventorship Deed of Assignment

- notarized & required when applicant and inventor is not the same

on filing date

Photographs/drawings

- required

- including seven [7] views, namely front view, rear view, right view, left view, top view, bottom view, perspective views presented with solid lines at the same scale

- the drawing in state of use is also required when the design is a part of product

on filing date

English description of the salient novelty features of design and claims for protection.

- required

on filing date

 

Convention Based-Application

 

documents

remarks

time of filing

Power of Attorney

- notarized

on filing date

Priority document

- certified copy which issued by the first receiving office

- English & Laos translations are required

within three [3] months from the filing date for the original

Priority Deed of Assignment

- notarized & required when applicant is other than one in priority document

within three [3] months from the filing date for the original

Photographs/drawings

- required

- including seven [7] views, namely front view, rear view, right view, left view, top view, bottom view, perspective views presented with solid lines at the same scale

- the drawing in state of use is also required when the design is a part of product

on filing date

English description of the salient novelty features of design and claims for protection.

- required

on filing date

Copy of examination report of corresponding application in foreign country

- if any

on available

Copy of registration certificate of design obtained in foreign country

- if any

on available


[3] examination

 

An application for design in Laos shall be conducted the formality examination and substantive examination with the alternate publication.

 

formality

 

The examination as to formalities will be commenced from the filing date. The duration will take about two [02] months from the filing date.

 

Time limit to make the response to the Office Action is two [2] months counted from the issued date of the notice.

 

substance

 

Duration of substantive examination is three [03] months.

 

Time limit to make the response to the Office Action is three [03] months counted from the issued date of the notice.

 

publication                                           

 

The design application will be published when 150 industrial design application/registrations are in order to be advertised but no later than six months from the filing date.

After granted, the design registration shall be published.

 

grant     

                       

Normally, the whole duration for obtaining a Patent for design will take about six [06] months from the filing date.

 

[4] deferment of publication                                           

 

The deferment of publication is available in a period of twelve [12] months from the date of filing or priority date. In this period, the owner cannot institute court proceedings against any person or legal entity who infringes his/her industrial design.

 

[5] term & renewal

 

Term of protection of design is five [05] years from the filing date and renewable twice, each for five years, that is the maximum term of protection of design is fifteen [15] years.

 

A six-month grace period is allowed for the late payment of the renewal fee, with an additional surcharge.

 

Additionally, the maintenance of the patent design is also required. Accordingly, an annual fee shall be paid in advance each year. 



SUMMARY [+]

PROCEDURE [+]